pintech.app

Ice Fever: fit the MA736 disc puck kit

Steps

  • Switch the game off and take out the backglass.
  • Remove the three screws holding the centre ball guide top (24406) and its three tubes; keep the guide top, discard the old plastic and the nylon ball puck.
  • Swing out the insert, unplug and remove the control board, and remove the three support posts MP40 and their screws from the back of the insert.
  • Drill two new #42 holes as the kit sheet shows (11/16 in right of hole A, then 9-1/2 in further right) and press in the new ball guide rail 24468 until its grip edges are hidden.
  • Move the #6 screw so the lower ball guide rail drops 1/4 in, and bend the last 4 in of the rail up 3/8 in.
  • Fit the nylon disc puck 24470 centred on the kicker arm 24399, with about 3/16 in clearance from the curved rail.
  • Refit the guide top with two screws and tubes at opposite corners, refit the control board and cables, swing the insert back and refit the glass.

Turn the game off before removing the control board.

Systems

Source: Premier Technology Parts Catalog (System 80, 80A and 80B), Gottlieb / Premier