Power supply bring-up, step 1: inputs
Steps
- Game off: pull and continuity-test every bottom panel fuse, and confirm ratings and types (SB or NB).
- Unplug power supply J2 (top) and J3 (right); leave J1 (bottom) plugged in, the right way up.
- Power on and read the AC inputs at A2-J1: pins 1-2 about 11.5 V AC (white/blue, white/orange), pin 3 ground, pins 4-5 about 14 V AC (white/brown, white/purple), pins 6-7 about 69 V AC.
- Then read the J2 and J3 outputs before plugging anything else in.
The bottom panel carries 120 volt line power; unplug the game before touching the transformers, line filter or fuse block.
Systems
Related tips
- Power supply bring-up, step 2: CPU load
- Power supply bring-up, step 3: displays
- System 1 power supply outputs
- Replacing power supply filter capacitor C1
- Getting to the power supply solder side
- Quick checks on the similar System 1 power supply
- Display high-voltage section of the power supply
- Logic and display reference section of the power supply
Source: Gottlieb System 1 Pinball Repair from 1977 to 1980, Clay Harrell (pinrepair.com)