Testing a leaf switch diode in place
Steps
- Leave all wires on and the switch open.
- Meter on diode test: black lead on the banded end, red on the unbanded end; expect 0.4 to 0.6.
- Reverse the leads; expect no reading.
Systems
Related tips
- Credit button and a whole switch row dead: shorted diode on one switch
- Using the System 11 switch tests
- Cleaning leaf switch contacts
- System 11 switch matrix differences
- Entering the System 11 switch tests
- Strange behaviour across a whole row or column from a switch diode
- Testing the switch columns with a clip lead
- Testing the switch rows with a clip lead
Source: Repairing Williams System 11 Pinball 1986 to 1990, Part Three, Clay Harrell